The Federal Government through the Ministry of Works has announced plan to commence the repair of damaged expansion joints of the Long Bridge along the Lagos-Ibadan expressway.

According to a statement signed by the Federal Controller of Works, Lagos, Mrs Olukorede Keisha on Friday, the repair would commence from 7am on Monday March 4 to March 25, 2024.

Kesha said commuters leaving and entering Lagos through the Long Bridge would be narrowed to two lanes on both sides of the bridge to enable the contractor handling the repair works to commence works on the other two lanes of the carriageways.

The statement read, “The Federal Ministry of Works wishes to inform the motoring public that repair works for the damaged expansion joints on the Long Bridge will commence by Monday, 4th of March 2024 simultaneously on both bounds of the bridge.

“Consequently, traffic leaving and entering Lagos through the Long Bridge will be narrowed to two lanes on both sides of the bridge to enable the contractor handling the repair works to commence works on the other two lanes of the carriageways.

“Thus, all road users are advised to be patient and adhere to lane discipline on both approaches to the Long Bridge and around the narrowed sections on the bridge.”

To ease the traffic during the repair period, Kesha explained that the earth road beside the Shagamu bound carriageway would be made motorable to serve as a complimentary road, while advising other road users to use alternative routes.

“Motorists are further advised to cooperate with the traffic management officials deployed to manage traffic and ensure hitch-free movements to minimize discomfort during the duration of the repair works,” Kesha said.